Mile 264 Report
Tierra Del Mar
January 7, 2021
Dune removal.
Report Details
Dune removal. See photos. Also, the Facebook drilling was active with a large loud machine working.
Conditions
Temperature: 50 F. Wind Velocity: Strong. Wind Direction: S. Tide Level: 1.0 feet.
Human Activities
Number of people: 5. Number of dogs: 3. Walking or running: 5. A large dune has been removed to provide a view for a large house under construction. Trees have been toppled and pushed onto the beach. It seems that the large dune that has been removed spanned private and public property.
Concerns
Vehicles
Driftline Content
Marine debris (plastic, styrofoam, etc. washing in from the sea). Much more small and micro plastics than normal.
Man-made Modifications
Dune modification/removal, Sand removal. The large dune at the end of Pollock Ave. has been removed as part of a new home being constructed. It seems to have spanned private and public property. Trees have been pushed down onto the beach.
Actions & Comments
I'm not sure about the legality of the dune removal.
Report Images
All Mile 264 Reports
Mile 264
Tierra Del Mar
You would never know that fireworks are illegal on Oregon beaches. https://vimeo. https://vimeo. https://vimeo. https://www.
Ronald Bourke
Mile 264
Tierra Del Mar
Beach was very clean with virtually no man-made debris.
rbourke
Mile 264
Tierra Del Mar
Nice, sunny, late afternoon with few folks on the shoreline.
QuanB