Mile 238 Report
February 17, 2022
Several riprap projects are underway in Mile 238.
Report Details
Several riprap projects are underway in Mile 238. The access at Seagull Lane is being reconstructed and mainly used by bulldozers working on the riprap, so best to avoid that area when working. Another project happening near access 50A, which can't be used at this time. Other unmarked accesses between 50A and 50 are dangerous, either due to naturally-formed drop-offs or current riprap projects.
Conditions
Temperature: 45 F. Cloud Cover: Sunny. Wind Velocity: Calm/Light.
Human Activities
Number of people: 1. Number of dogs: 2. Walking or running: 1.
Driftline Content
Small rocks, Seaweeds and seagrass, Shells, Animal casings (e.g., crab, shrimp molt), Wood pieces.
Man-made Modifications
New riprap or shoreline protection structures. Riprap projects occurring all along the Salishan spit in various locations.
Report Images
All Mile 238 Reports
Mile 238
Beach was completely deserted today. The only usable accesses are at 50B and in between properties 281 and 283.
Catherine Berger
Mile 238
Some beach accesses have been reopened (50B and between property 281/283).
Cathy238
Mile 238
Beach accesses are currently closed along Salishan Drive, except at the end of the road at access #50, and an unmarked access at lot #349.
Cathy238
Mile 238
Very little activity and little debris (logs, kelp, etc) today on this mile.
Cathy238