Report Details

The PacWave South wave energy project hosted a BBQ today at Driftwood Wayside for staff and neighbors to celebrate the completion of construction work here and the reopening of the Wayside later this month. Taking advantage of the sunny day, a crew also worked at striping the parking lot. The Wayside looks improved from before construction work began, with the freshly asphalted parking lot, new walkways, and an ADA accessible viewing platform that provides an expansive view of Driftwood Beach.  All of the vegetation bordering the Wayside was protected during construction, including the Kinnikinnick plant on which the endangered Seaside Hoary Elfin butterfly depends. PacWave's land-based work now shifts east of Highway 101, where an energy collection and monitoring compound will be built. Actual collection of wave-generated electricity and transmission to Central Lincoln PUD's power grid is scheduled to begin sometime next year.

Conditions

Temperature: 60 F. Cloud Cover: Sunny. Tide Level: 2.5 feet.

Report Images

Report Images

Share this post

All Mile 204 Reports

Showing 8 of 55 reports

Mile 204

Driftwood Beach Wayside, Buckley Creek

November 19, 2023

Today marked my latest sighting of the old growth driftwood log that I've admired and whose comings and goings from Driftwood Beach I've documented since June 2020, when I first photographed it high on the beach south of Buckley Creek.

Jon French

Mile 204

Driftwood Beach Wayside, Buckley Creek

August 11, 2023

I had read that the 265-foot vessel Seacor Lee would be anchoring a mile off Driftwood Beach in support of OSU's PacWave South wave energy testing project, positioned so that divers from the ship could perform work on previously installed seafloor conduits.

Jon French

Mile 204

Driftwood Beach Wayside, Buckley Creek

June 17, 2023

I haven't walked Driftwood Beach regularly since the PacWave South wave energy project completed work underground in the Driftwood parking lot.

Jon French

Mile 204

Driftwood Beach Wayside, Buckley Creek

January 1, 2023

By the time I got to Driftwood Wayside, a lot of people had already arrived for their New Years Day beach walks, some 30 vehicles in the parking lot and 30 - 40 people down on the beach, accompanied by at least half as many dogs, almost all leashed.

Jon French

Mile 204

Driftwood Beach Wayside, Buckley Creek

October 23, 2022

This was probably the last dependably dry Mile 204 walk before the rains begin in earnest.

Jon French

Mile 204

Driftwood Beach Wayside, Buckley Creek

August 17, 2022

After the morning fog lifted and before the marine layer moved in, I walked from Seal Rock on Mile 205 to Beach Access 66C on Mile 203.

Jon French

Mile 204

Driftwood Beach Wayside, Buckley Creek

June 3, 2022

Driftwood Wayside is open again after PacWave's departure, but I was the only visitor on this breezy, drizzly day.

Jon French

Mile 204

Driftwood Beach Wayside, Buckley Creek

May 10, 2022

The PacWave South wave energy project hosted a BBQ today at Driftwood Wayside for staff and neighbors to celebrate the completion of construction work here and the reopening of the Wayside later this month.

Jon French